Use this initial hazard identification checklist to assess risks before construction or demolition works begin. It guides teams through pre-start surveys (UXO, asbestos, lead, silica, legionella), existing services and isolations, environmental considerations, occupational health (noise, dust, vibration, HAV), chemicals and fuels, excavations and earthworks, structural removals, temporary works, confined spaces, manual handling, traffic and pedestrian management, working at height, scaffolds and access, lifting operations, plant and equipment, vehicle movements, roof works, trip hazards, welfare facilities, permits to work, hot works, PPE, and electrical restrictions. Capture findings, agree controls, and sign off readiness to proceed.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
