Skip to content
SafetyCulture
Template

PAIR Form for Plant Use in Rail and Construction

by Kristian Guy, from the Community

Downloads: 0
Get this template

This PAIR Form for Plant Use supports safe rail and construction activities by guiding teams through key checks and documentation. It covers plant provider details and types, safe systems of work, LOLER status for host machines and attachments, pre-start and lifting tackle checks, and space for additional comments. The form prompts verification of lift plans, ALO availability, OTP and POS briefings, and required signatures. It includes competence evidence such as Sentinel, NPTC, CPCS, NPORS, and City and Guilds, plus on-site controls like duplex communication, test-before-touch, exclusion zones, plant awareness, fitter availability, and POS arrangements. Site logistics are addressed, including RRAP sufficiency, storage or haulage areas, traffic management, emergency tow bar, and in-date fire extinguishers. An actions section ensures owners and due dates are captured before sign-off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.