Office and Stores Housekeeping Audit Checklist
by Tim Weaver, from the Community
Use this gas engineer completion form to document key installation and commissioning checks. Capture flue termination and integrity, gas meter and pipework details, condensate run and termination, tightness test results, analyzer commissioning figures, benchmark records, and gas safety documentation. Include system design details such as S plan or Y plan and feed or vent positioning for heat-only systems. Confirm customer satisfaction and obtain signatures. Ideal for standardizing boiler and heating installs and maintaining compliance records.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
