Skip to content
SafetyCulture
Template

NJS Scaffolding Scaffold Anchor Tie Test Report

by Ryan Miller, from the Community

Downloads: 20+
Get this template

Use this scaffold anchor tie test report to document physical pull tests in line with NASC TG4. Capture client and site details, anchor type and location, base materials, the number of tests, required and achieved test loads, and pass or fail outcomes. Record test equipment used and its calibration date, attach calibration certificates, and note the installer of ties. Select the tester, sign the report, and include corrective actions or retests where needed. Supports TG20 and TG4 compliance and helps verify anchorage before scaffold use.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.