This quality control checklist supports the installation of Y-Wall sheathing boards on site. It guides teams to verify required 2 to 5 mm gaps with fire rated mastic to Y-Wall specifications, correct fixing patterns, and completion by elevation, level, and section. The form includes hold points for photo evidence of completed works, space for notes, and a final sign off signature to confirm due diligence. Use it to document issues, rectification, and inspection status for compliant, auditable building envelope works.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
