Fire Barrier and ACM Sub-Structure Checklist
by Alan Shiels, from the Community
Use this construction inspection and handover checklist to verify installation quality of fire barriers and ACM cladding sub-structure. Confirm alignment and continuity of horizontal and vertical barriers, correct orientation of intumescent strips, tight joints, adequate cavity packing, bracket spacing, and helping hand supports and rails per drawings. Capture photos, record comments, and sign off for client handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
