This Standard Operating Procedure outlines how to wire new houses and sheds safely and in compliance with AS3000. It includes required PPE, common hazards, and control measures for working at heights, using power tools, and manual handling. The step-by-step process covers preparing the site, drilling and installing brackets, planning cable routes, running and labeling cables, taping ends, completing the fit-out sheet, updating job records and materials, and tidying the work area. Designed for residential electrical installations, it serves as a practical guide to promote safety, organization, and compliance on site.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
