2nd Fix Rainwater and SVP Stack Test Checklist
by Danny Denton, from the Community
This practical QA checklist guides teams through 2nd fix rainwater and soil vent pipe (SVP) stack testing. Record site details, date, preparer, and location. Identify the stack number per schematic, then insert test bags above the highest branch and below the lowest branch. Set up the test rig and perform a 38 mm U gauge pressure check, capturing a photo at the start and another after three minutes. Document whether the stack passed, and obtain the engineer’s signature to complete sign-off. Ideal for on-site verification and documentation during the second fix phase.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .