This checklist helps contractors verify and sign off 1st fix plumbing and heating installations. It covers pipework materials and clipping, radiator outlet locations, hot and cold water runs, HIU first fix rails, lagging and non-combustible fixings, bathroom cisterns and shower pipe positioning, photo evidence, and engineer sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
