This hydraulic lift progress inspection checklist supports construction teams through elevator installation and commissioning. It covers mobilisation works, site safety and PPE, construction phase planning, and first aid readiness. Technical sections guide checks on guide rails, sling, car body, hydraulic jack and plinth, buffers, machine room lighting and electrics, control system and power unit, hydraulic hoses and fittings, suspension and overspeed governor, car electrification, car top controls and guarding, well wiring and lighting, landing entrances and signalisation, car interior finishes and COP, doors and door operator, pit wiring, autodialler and GSM, monitoring systems, firefighters provisions, and special features. Final steps include testing, commissioning, and ride quality measurements with space for notes and observations.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.