Environmental Management Audit for Refurb/Demolition
by John Conroy, from the Community
This audit form supports environmental management oversight during refurbishment and demolition activities. It covers management, refurbishment, demolition and re‑inspection surveys, bulk sampling, approvals before and after audits, and auditor/auditee sign-off. The checklist guides pre‑start health and safety reviews, RAMS verification, PPE/RPE and mask fit checks, surveyor competencies (P402, UKAS RG8), equipment inspections, and waste handling. It includes detailed sections for general surveying, management, refurbishment and demolition assessments, site drawings, sampling strategies, access limitations, recommendations, and data accuracy in line with HSG264. Use it to ensure systematic, compliant inspections and clear reporting across domestic, commercial, and industrial sites.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
