Skip to content
SafetyCulture
Template

LED Scoping Document Primark 2022

by Ben Sheard, from the Community

Downloads: 10+
Get this template

Use this comprehensive LED scoping checklist for Primark store refits. Designed for electrical contractors, it captures essential site details to support design, logistics, and procurement. Sections include store and parking info, ceiling heights across floors, access equipment and lifter routes, goods lift status, ceiling tile references, existing BOH and sales floor lighting, emergency lighting compliance and test switching, external fittings, distribution boards, contactor and BMS panels, loadings, proposed luminaires and fire hoods, health and safety including asbestos survey, programme dates, delivery restrictions, pallet storage, and manufacturer requirements for Dextra.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.