Skip to content
SafetyCulture
Template

Kinley and Athen Installation Sign-Off Checklist

by Paul McCarthy, from the Community

Downloads: 10+

Use this installation sign-off checklist to verify Kinley and Athen freezer cabinets are installed correctly during retail store fit-outs. Confirm end panels and black bumpers are fitted, SPOS ticket strips applied to shelves, and any required post-factory modifications completed. Check cabinet alignment for bollard installation, inspect for scratches or damage, capture multiple photos, and document notes. Obtain signatures from the client representative, builder, and installer to certify completion and quality.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.