Use this rendering and special coatings checklist to plan, execute, and quality-check plastering and render works. It covers risk assessment and method statements, builder’s work completion, protection of windows and doors, sample approval, and compliance with specified mix strengths and surface finishes. Verify substrate key and control joint locations, curing materials, and that no retarding agents are used. For site-mixed mortars, align with BS 4887 Part 1. Inspect backing coats, moisture and drying times, thickness control, intervals between coats, and conduct a final surface check before scaffold removal. Ensure protection is removed and the area is left clean.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
