This Inspection and Test Plan supports the Retic24 Metro Valve Installation program. It guides field teams through pre-start requirements and documentation, verification of licences and equipment checks, and readiness of materials. Construction steps include traffic management setup, excavation, isolation confirmation, component disinfection, valve set construction and installation, thrust and chamber requirements, and compliant backfilling. It outlines recharge confirmation, reinstatement details, and site close-out tasks such as EPA-compliant disposal, demobilisation, and measurements for GIS updates, ensuring quality, safety, and alignment with drawings and scope.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.