Skip to content
SafetyCulture
Template

HSQE 38 Drainage Sign Off Sheet

by Tom Beever, from the Community

Downloads: 0
Get this template

This free HSQE 38 Drainage Sign Off Sheet helps construction and civil engineering teams document drainage runs and approvals. Capture manhole details, cover and invert levels, benching and pointing acceptance, pipeline specs, backfill checks, spurs, air testing, and snagging status. Collect client and contractor signatures to confirm acceptance. Use digitally in SafetyCulture to streamline inspections and recordkeeping.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

HSQE 38 Drainage Sign Off Sheet Checklist | Free Template | Free Template