Horizontal Fire Barrier in Terracotta Rainscreen
by Martin Coupe, from the Community
Use this quality assurance checklist to inspect horizontal fire barriers within terracotta rainscreen cavities. Verify location to approved drawings, correct Siderise brackets and required folds over the intumescent strip of 15 mm, maintain a ventilation gap of 25 mm plus or minus 3 mm, apply foil tape to all joints and abutments, and keep the area clean. Capture photos and notes, assign corrective actions with priorities and due dates, and obtain installer, A2O, and client signatures. Export reports as PDF, Word, Excel, or a web link.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
