This concrete placement sign off checklist helps construction teams verify critical pre pour requirements, including rebar and wire mesh placement, formwork condition, vapor barrier installation, anchor bolt locations, embedded items, drains and conduits, perimeter insulation, expansion material, and correct mix design. Use it to document checks, attach photos, and capture acceptance signatures before concrete is placed, improving quality control and reducing rework.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.