Skip to content
SafetyCulture
Template

General Construction Daily Report Template

by Steven Baird, from the Community

0
Get this template

This general construction daily report template helps crews and supervisors capture a complete record of each workday. Log weather and site conditions, rescheduling or lost days, and safety topics such as PPE, slips, trips and falls, working at heights, traffic control, emergency procedures, electrical hazards, and heat or cold stress. Record incidents with what occurred, who was affected, location, timing, and causes. Track subcontractor activity, units and areas worked, crane picks, seating and fixture counts, post wattage checks, and quality inspections. Note obstacles to schedule or scope, materials delivered, M and V and commissioning requirements, site visitors, and attach photos for documentation.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.