Skip to content
SafetyCulture
Template

FSSW SOP crawler crane assembly / disassembly

by Kat La Chapelle, from the Community

Downloads: 40+
Get this template

This Standard Operating Procedure (SOP) document outlines essential safety protocols for crawler crane assembly and disassembly operations. It covers critical aspects including traffic coordination, track positioning, gantry raising, counterweight installation, and wire rope management. The document details specific hazards associated with each task and provides corresponding corrective measures to ensure worker safety. Key focus areas include proper PPE usage, rigging inspection requirements, fall protection protocols, and certification verification. The SOP emphasizes the importance of qualified personnel, proper communication during operations, and thorough equipment inspection before and after use. It serves as a comprehensive guide for maintaining safety standards and regulatory compliance in crane operations.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log
Click below to load the preview and explore the details.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.