Form 36 Risk Based Audit Checklist for Scheduled Waste
by Faradiah Md Dali, from the Community
With SafetyCulture you can
With SafetyCulture you can
Description
Form 36 provides a detailed risk-based audit checklist for scheduled waste management compliance. This comprehensive document covers essential aspects including waste identification, storage requirements, facility maintenance, documentation procedures, and disposal protocols. The checklist ensures compliance with DOE regulations, proper waste handling procedures, and safety standards. It includes verification points for storage area specifications, container requirements, labeling standards, inventory management, and staff training requirements. The form also tracks necessary documentation such as consignment notes, contractor licenses, and training records, making it an essential tool for environmental compliance auditing.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.