Post Extraction and Cavity Wall Survey PAS 2035
by Vinnie Stokes, from the Community
Use this checklist to survey cavity walls after insulation extraction and assess suitability for reinstallation in line with PAS 2035. Capture site and property details, tenure and construction, external finishes and structural condition. Record heating appliances, flue and chimney locations, and verify alarms. Document access and equipment needs. Perform post extraction inspections with borescope images, check wall ties, cavity cleanliness, vents, and finish repairs. Include internal checks for damp and condensation, ventilation requirements, and loft inspection. Measure cavity depths by elevation and log photos. Complete a dynamic risk assessment and client declaration. Finalize with installation checks and signatures.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
