This 1st fix HIU cupboard inspection checklist is designed for construction MEP works on residential units (Block B, LCIP2). It guides site teams through key quality checks, including minimum HIU stand-off from wall, correct installation of PRV, waste and washing machine water feeds, protection to HIU, presence of water meter, and insulation/phenolic lagging to primary flow and return. Fields include block, level, flat number and type for clear traceability. Intended as a practical QA aid for Enviromech and project teams on London City Island Phase 2.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
