Use this pre-task hazard assessment from Duro Electric to plan work, identify hazards, and define controls before starting a job. Record project details, scope and step-by-step tasks, then evaluate risks such as falls, ladder work, electrical shock, silica, overhead work, and excavation. Select protective measures including PPE, fall protection, scaffolds and lifts, barricades, GFCI, and tool inspections. Document required permits and briefings, capture crew names and signatures, and log incidents, near misses, and superintendent approval.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
