This drainage pre-inspection checklist helps construction teams verify sewer and stormwater works before approval. Check connections, pipe sizes and gradients, approved pipes and fittings to NZS 1260 and NZS 1254, bedding, vents, drain depth and protection, legal boundaries, and as laid plans. Confirm overflow relief gully position, terminal vents, level inverts per AS 3500, number of downpipes, soak holes or tanks, and water testing. Include septic tank installation, effluent field, distribution box, and trench dimensions. Supports engineer PS4 sign off and records pass or fail outcomes, including local requirements such as catchpits for large paved areas.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.