This DN-15a open cut mainlaying checklist supports safe and efficient excavation and utility main installation. It covers planning and setup, locating and protecting existing services, trench width control, use of mechanical excavators, banksman guidance, trench support and collapse prevention, weather and ground condition checks, and neat reinstatement in line with highway specifications. Includes assessor sign-off and training outcomes to document compliance and competency.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
