Skip to content
SafetyCulture
Template

DBC Pre Job Walk Checklist

by Justin Rapp, from the Community

Downloads: 10+
Get this template

This pre job walk checklist helps construction and remodeling teams prepare before work begins at a client's home. Use it to review the job binder, project scope and schedule, introduce the crew, and verify client contact details. Capture security and access information such as alarms, door or gate codes, keys, and preferred entry points. Plan daily operations including parking, foot traffic paths, surface protection, bathroom access, material storage, dumpsters, cleanup areas, and site signage. Gather site data on electrical panels, water shut-offs, attic access, framing direction, structural walls, and potential engineering needs. Record floor conditions and any existing damage, note casing, baseboard, or molding replacements, and document concerns with photos. Conclude with a client review, align on next steps, explain change order and sign-off processes, and confirm timelines and final payments.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.