This Climat Ducted 2nd Fix Job Checklist supports HVAC technicians during final installation and commissioning. Verify outdoor unit placement and ventilation, confirm any location changes approved by sales and customer, and record the electrical contractor. Document nitrogen purge and pressure testing, evacuation to a minimum of 500 microns, and perform a test run with any error codes noted. Ensure customer instruction and handover, check roof tiles or sheets are replaced, remove related rubbish, and capture photos of the outdoor unit and issues worth documenting. Includes fields for personnel on site and notes about other trades.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
