This installation checklist guides technicians through smart heating control setup and documentation. Record the subject address and client details, confirm whether a smart heating control was installed, and specify the product fitted. Capture photos of the installed unit in situ and its warranty, and obtain the operative’s signature. If installation was not completed, document reasons with photographic evidence. For RadBots, confirm installation status, note rooms covered such as living areas, bedrooms, kitchen, bathrooms, hallways, and landings, and add photos and warranty details. Conclude with client handover and sign off, confirming demonstration, understanding of operation, and receipt of warranties.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
