Terracotta Rainscreen Installation QA Checklist
by James Cowan, from the Community
This construction quality assurance checklist guides crews through terracotta rainscreen facade installation. Verify Tyvek membrane overlaps, repair tears, and sign off membranes. Confirm Rockwool Duo slab insulation placement behind galvanized top hats and between studs. Check helping hand brackets, aluminium rails, reveal flashings, and terracotta tiles fixed with clips and pins. Include insect mesh at terminations, maintain cleanliness, and record hold points for fire barrier inspections. Capture photos and notes, assign corrective actions with priorities and due dates, and collect installer, contractor, and client signatures.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
