Skip to content
SafetyCulture
Template

C1216 Edmonton Green - Remedial Works QA Checklist

by Lee Whittaker, from the Community

Downloads: 0
Get this template

This construction quality assurance template supports remedial works on the C1216 Edmonton Green project. It provides clear instructions, fields for project and location details, and step-by-step checks covering RWA 45 insulation, removal of existing foam and PIR where practical, full packing of insulation, Dowsil Firestop 700 bonding, and galvanized closers thickness, fixings, and sealing with EPDM paste. Capture photos, notes, and corrective actions, record hold points, track personnel, complete final waste checks, and obtain supervisor and management signatures.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.