Use this checklist to plan and verify cladding remedial works on buildings. Cover pre-start notes and strip-out, Siniat board installation, EPDM application, top hat, bracket and rail matrix, vertical and horizontal fire barriers, insulation, Swisspearl facade panels, and window flashings and head cills. Includes sign-off fields for site manager, client, clerk of works, fire engineer, architect, and building control to document quality, safety, and compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
