Use this ASC deck pour checklist to prepare and verify concrete deck pours on site. It guides crews through slab edge dimensions, blockouts and balcony handrail openings, embeds and keyways, DBRs, shoring grade, and compliance of post tensioning and rebar with approved documents. Confirm dowel layout, proper chairing, clear spacing at openings and drains, post tension sheathing condition, crack bars around required openings, and slab depressions at correct locations and depths. Includes post tension pocket checks before and after the pour, cleanliness of the deck, and space to record the mix design. Ideal for quality assurance, quality control, safety, and compliance during structural concrete pours.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
