A2O Brick Slip to Eurobond Panels QA Checklist
by William Carter, from the Community
This quality assurance checklist supports the installation and verification of brick slip systems to Eurobond panels. It guides installers and managers through key checks including drip flashing installation and spacing, alignment and spacing of top hats, correct fixing centres for Tek screws, and the level and compliance of cassette trays to construction drawings. It verifies brick seating, colour compliance by location, and readiness for handover. The template includes hold point sign offs by an A2O manager, fields for main contractor details and project information, and allows adding photos, notes, corrective actions, and digital signatures from installer, A2O, and client.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
