This practical quality assurance checklist supports the installation of Cape Cod timber cladding to quad-core panel systems. It guides teams through site setup and documentation, storage and acclimatization of timber, substrate inspections and sign-offs, and verification of gridlines and datums. It covers timber cladding specifics including batten dimensions, EPDM tape application, correct orientation for water run-off, and full insect mesh coverage. The checklist confirms fixings, timber joints, and 600mm spacing per A2O drawings, includes snag and de-snag steps, and captures installer, A2O, and client signatures for completion and accountability.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
