Rockpanel Cladding Installation QA Checklist
by Jonathon Young, from the Community
This construction QA checklist supports Rockpanel cladding installation for project C1218 Sixty 8 at the Marina. It covers delivery checks for panel damage, pre installation background sign offs, adherence to A2O construction drawings and manufacturer guidance, location verification, fixings inspection, clean down, and handover. Users can attach photos and notes, create corrective actions with assignees, priorities, and due dates, and capture digital signatures from the installer, A2O manager, and client to complete and share the report.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
