Skip to content
SafetyCulture
Template

CMI Preliminary Inspection Report (PIR)

by Charl Steenkamp, from the Community

0
Get this template

This CMI Preliminary Inspection Report (PIR) template supports assessments of commodity storage facilities such as silos, warehouses, tank farms, and bunkers. It covers location and contact details, construction and structural integrity, drainage, access and doors, ventilation and lighting, storage space and capacity, and presence of current stock. Safety and security checks include fire protection, alarms, CCTV, guarding, access control, and housekeeping. Operational areas review staffing, hours, subcontracting, handling and weighing equipment, calibration, and maintenance. Ownership, insurance, and any other collateral managers are recorded. The template concludes with risks, mitigations, suitability for CMI service scope, approval for safe cargo storage, conditions to fix, and next inspection date.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

CMI Preliminary Inspection Report (PIR) Template Guide | Free Template