Use this healthcare risk assessment to evaluate interim life safety measures during construction, renovations, or fire protection system impairments in hospital facilities. The checklist guides users to document locations, affected areas, and code deficiencies such as egress, compartmentation, and penetration issues, as well as construction-related risks and alarm or suppression outages. It prompts evaluation of risk severity, identification of protective measures, and selection of required interim life safety measures including inspections, drills, training, temporary partitions, and surveillance. It also records required notifications to safety, facilities, and administrative stakeholders to maintain compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
