This post eaves and cladding report checklist helps site supervisors record quality checks after installation. Capture location, client, date, photos, and signatures. Verify sarking and alcor at corners and windows, check eaves parallel to brickwork, ensure cladding is level, gaps are filled, nails are correctly set, and fibro nails are placed to centers. Note extra work, window setout for 10 mm plasterboard, and overall quality rating. Upload final photos and document any issues.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .